Contact us on 01851 705743 or
email info@welovestornoway.com

The following planning applications are pending consideration by Comhairle nan Eilean Siar. 

All information and accompanying documents are publicly available on the CnES website

 

Electronic apparatus, Achmore

Arqiva Ltd has applied for planning permission to install electronic apparatus at Eitshal Transmitter, Achmore.

 

Agricultural building and access track, Lochs

Miriam Hamilton of 22a Crossbost has applied for planning permission to erect an agricultural building at 19 Crossbost, Lochs. The building is to be 12 metres long, 4 metres wide and 4 metres tall. Work is to include creating a new access.

 

Polycrub, Borve

Donald A Macdonald of as applied for planning permission to erect a polycrub at 27 Fivepenny, Borve. The polycrub is to be 7.44 metres long, 4.2 metres wide and 2.6 metres tall.

 

Communications mast, Breasclete

The Scottish Salmon Company has applied for planning permission to erect a 12m high guy-wired communications mast and install one satellite dish of 315mm diameter at Breasclete Pier Mast.

 

Phased development for factory, Breasclete

BASF (Pharma) Callanish has applied for planning permission for the phased development for a factory building, solvent recovery unit, boiler house, sprinkler pump house and tank, fire water recovery tank, walkway bridge connecting to the existing factory buildings, service yards and access roads, at BASF (Pharma) Callanish, Breasclete. Planning application involves retrospective submission for a tank farm.

 

Polycrub and hardstanding, Holm

Donald Smith of An Ard, Holm Village Road, Stornoway, has applied for planning permission to erect a polycrub and create a hard standing at Holm Road, Holm. The polycrub is to be 10 metres long, 4 metres wide and 3 metres tall. Work will create parking suitable for two cars.

 

Improvement of track, Uig

Alexander Sharp of 3 Enaclete has given prior notification of his intention to improve the track at 3 Enaclete, Uig.